This is the Mayor’s proposed 2027 budget, pending City Council adoption (expected in December). Figures may change before the budget is adopted.

SWINDELL BRIDGE (TIP)

Engineering and Construction DEPARTMENT OF MOBILITY AND INFRASTRUCTURE Continuing, Capital Project PM: Deputy Director, Mobility and Infrastructure

Pages 93–94 in Capital Budget · 1table · includes narrative

Page 93

SWINDELL BRIDGE (TIP)

Functional Area: Engineering and Construction Project Type: Continuing, Capital Project Responsible Department: DEPARTMENT OF MOBILITY AND INFRASTRUCTURE Project Manager: Deputy Director, Mobility and Infrastructure

Capital Improvement Program

Project Description

This project is a rehabilitation of the Swindell Bridge, originally constructed in 1930, which connects the Perry South and Spring Hill – City View neighborhoods. The bridge carries Charles Street over the East Street Valley and I-279, for a total length of 1,097 feet.

Project Justification

The structure is in a state of advanced deterioration with the deck and superstructure rated as poor. Intervention is required, either in the form of rehabilitation or replacement, for the safety of those traveling over and under the bridge.

cip_funding Page 0, Table 0 (p. 93 in full PDF)

Shows capital project funding by source and year.

Source2026202720282029203020312032Total 2027-2032
CDBG0
BOND195,838391,675158,350745,863
PAYGO0
OTHER3,720,9137,441,8253,008,65014,171,388
TOTAL003,916,7517,833,5003,167,0000014,917,251

Operating Budget Impact

This project represents a minimal operating expense other than the time of DOMI staff. A rehabilitated bridge should realize some operational maintenance savings.

Unexpended/Unencumbered Prior Year Funds $713,798

Page 94

SWINDELL BRIDGE (TIP)

2027 Deliverables and Objectives