28TH STREET BRIDGE (TIP)

Engineering and Construction DEPARTMENT OF MOBILITY AND INFRASTRUCTURE Continuing, Capital Project PM: Deputy Director, Mobility and Infrastructure

Pages 27–28 in Capital Budget · 2tables · includes narrative

Page 27

28TH STREET BRIDGE (TIP)

Functional Area: Engineering and Construction Project Type: Continuing, Capital Project Responsible Department: DEPARTMENT OF MOBILITY AND INFRASTRUCTURE Project Manager: Deputy Director, Mobility and Infrastructure

Capital Improvement Program

Project Description

This project is a rehabilitation of the 28th Street Bridge, originally constructed in 1931 on the site of a previous bridge, which connects the Strip District and Polish Hill. The bridge carries 28th Street between Liberty Avenue and Brereton Street, a total length of 315 feet.

Project Justification

Recent inspections have shown that the bridge is in need of immediate repairs. Undertaking the design of a rehabilitated bridge would result in operational and maintenance cost savings in the long run.

cip_funding Page 0, Table 0 (p. 27 in full PDF)

Shows capital project funding by source and year.

Source2026202720282029203020312032Total 2027-2032
CDBG0
BOND180,000125,000125,000430,000
PAYGO0
OTHER3,420,0002,375,0002,375,0008,170,000
TOTAL03,600,0002,500,0002,500,0000008,600,000

Operating Budget Impact

This project represents a minimal operating expense other than the time of DOMI staff. A rehabilitated bridge should realize some operational savings.

Unexpended/Unencumbered Prior Year Funds $317,842

Page 28

28TH STREET BRIDGE (TIP)

2027 Deliverables and Objectives

Deliverables are tentative and subject to change Location

Figure
Figure for 28TH STREET BRIDGE (TIP)
deliverables Page 1, Table 0 (p. 28 in full PDF)

Lists project objectives, deliverables, and performance measures.

Deliverable/ObjectiveLocationDistrictFundCost
28TH ST BRIDGE - CONSTRUCTION28th St & Brereton StDistrict 7BOND180,000
28TH ST BRIDGE - CONSTRUCTION (TIP)28th St & Brereton StDistrict 7OTHER3,420,000